Loading Events

« All Events

  • This event has passed.

Eastside Transit Corridor Phase 2 Meeting #3: Cities of Pico Rivera and Santa Fe Springs and Los Nietos Community

September 7 @ 4:05 pm

The reinitiated environmental process will include the development of a Recirculated Draft Environmental Impact Report (under CEQA) to update the 2014 Draft EIS/EIR. This process includes advanced conceptual engineering, environmental analysis and ongoing outreach efforts. We anticipate releasing a Recirculated Draft EIR for public review in 2022.

Join Metro for virtual meetings in March to provide an update on the project. All meetings will have a mobile tech van available at each site with virtual Spanish interpretation.

 

Zoom Meeting

Link: https://tinyurl.com/mrxd844d

Call-In Number: 213.338.8477

Meeting ID: 853 2408 0924

Spanish Call-In: 872.240.3212

Spanish Access Code: 510-930-613

 

Tech Van Location

Pico Rivera Senior Center

9200 Mines Av

Pico Rivera, CA 90660

Details

Date:
September 7, 2025
Time:
4:05 pm
Event Category:
Scroll to Top

Metro will run a Sunday schedule this Fri, July 4. Some bus lines are detoured for holiday events.