Loading Events

« All Events

  • This event has passed.

Eastside Transit Corridor Phase 2: Public Hearing #4

September 2 @ 1:39 pm

Metro has a plan to make it easier to get around, including the Eastside Transit Corridor Phase 2 project, which proposes an extension of the L Line (Gold) further east from its current terminus at Pomona Bl and Atlantic Bl in East Los Angeles. 

A Draft Environmental Impact Report (EIR) has been released for public review and comment. Comments on the Draft EIR will be accepted through August 29, 2022, at each public hearing or via any of the following methods: online at metro.net/eastsidecomments or by calling 213.922.3012. 

Public hearings will take place (both in person and virtually). For the latest information, please visit metro.net/eastside2022. 

IN PERSON – WHITTIER 

Wednesday, August 17, 2022, 6–8pm 

Whittier Community Center (Gymnasium) 

7630 Washington Av, Whittier, CA 90602 

Details

Date:
September 2, 2025
Time:
1:39 pm
Event Category:
Scroll to Top

Metro will run a Sunday schedule this Fri, July 4. Some bus lines are detoured for holiday events.